Easement (0)
600 HP Pump Station/6MG Storage Facility (1)
Test Well (4)
Proposed Well Location (5)
Water Well (City of Sinton) (7)
Water Well (TWDB) (8)
Oil and Gas Well Points (10)
Proposed ON Stevens Connection (42") (14)
Proposed Dresser Connection (15)
Proposed Robstown Connection (16)
Proposed Water Pipelines (18)
| Pipeline Phase 1 |
| Pipeline Phase 2 |
| 42" Transmission Pipeline |
Dresser Water Line (19)
Mary Rhodes 64" Water Line (20)
Pipelines (RRC) (22)
Oil and Gas Pad Reservations (33)
Proposed Solar Field (24)
Solar Field (25)
Evangeline Wellfield (26)
Parcels (Surveyed) (28)
Well Field Parcels (SPCAD) (29)
Parcels (SPCAD) (30)
City Limits (TxDOT) (31)
County Line (32)
|