Preferred Route (1)
Booster Pump Station (2)
BPS Access Road (3)
WTP Conceptual Layout (4)
Deed Property Lines (5)
Bathymetric 2019 (6)
| 5' Contour |
| 1' Contour |
Flexible Pipe (NPR) (8)
Rock Berm (NPR) (9)
Silt Fence (NPR) (10)
Temp Coffer Dam (NPR) (11)
Timber Matting (NPR) (12)
Intake Locations (13)
Laydown Area (14)
Streams (Cardno) (16)
Streams (PD) (17)
Wetlands (PD) (18)
Wetlands (Cardno) (19)
Contours 1ft (PD) (42)
| 5' Contour |
| 1' Contour |
Affected Parcels (21)
Master Survey Boundary (22)
DoD Property Monument Point (USACE) (24)
Outgrant Area (USACE) (25)
Parcel Acquisition Area (USACE) (70)
Sensitive Sites (USACE) (26)
Sensitive Site Buffers (USACE) (27)
USA Lake Parcels (28)
TEX AMERICAS Parcels (29)
Easements (30)
Geotech Tracking (32)
| Not Scheduled |
| Scheduled |
| Complete |
Cultural Tracking (33)
| Not Scheduled |
| Scheduled |
| Complete |
Envrionmental Tracking (34)
| Not Scheduled |
| Scheduled |
| Complete |
Land Acquisition Tracking (35)
| Remaining |
| Offer |
| Negotiating |
| Non-Responsive |
| Legal |
| Acquired |
ROE Tracking (36)
| Remaining |
| Issued |
| Obtained |
| No Response |
| Expired |
Survey Tracking (37)
| Not Scheduled |
| Scheduled |
| Complete |
Floodplain (FEMA) (38)
| DFIRM 100 Yr. Floodplain |
| DFIRM 500 Yr. Floodplain |
| DFIRM 100 Yr. Floodplain (Future Conditions) |
Waters of the US Lines (40)
| Ephemeral |
| Intermittent |
| Perennial |
Waters of the US Areas (41)
| Ephemeral |
| Intermittent |
| PEM |
| PFO |
| PSS |
| PUB |
| Perennial |
|